We organize the transfer of data centers or standalone equipment, followed by data migration.
We take care of all the routine operations of equipment transportation with minimal or no downtime.
We will provide an agreed and detailed plan for the migration of computing and telecommunication systems, transportation, installation, switching, backup and data migration. If necessary, we will conduct an audit of information systems for subsequent transfer, transparent to users.
We reserve all the important information and create active-active equipment. Thanks to this, it will be possible to carry out the migration without interrupting business processes. We preserve the network topology to reduce equipment setup after the move.
Before migrating systems, we carefully analyze each stage from transportation and installation to backup and data migration. This allows us to move computing and telecommunications systems in just a few hours.
We develop a detailed plan of the move including inventory and labeling of equipment, draw up a cable log, plan the move, installation and switching. You do not have to worry about data loss or system damage.
We reserve all the important information and create active-active equipment. Thanks to this, it will be possible to carry out the migration without interrupting business processes. We preserve the network topology to reduce equipment setup after the move.
Before migrating systems, we carefully analyze each stage from transportation and installation to backup and data migration. This allows us to move computing and telecommunications systems in just a few hours.
We develop a detailed plan of the move including inventory and labeling of equipment, draw up a cable log, plan the move, installation and switching. You do not have to worry about data loss or system damage.
Trusted by CIOs and CTOs of various leading companies. We guarantee the fastest and safest migration and installation of IT equipment. We help with both partial and full equipment migration.
Centralized the computing resources of the production cluster within a single data center. Our specialists transported the main computing equipment used in different data centers to the newly developed site.
To update engineering systems while preserving investment in computing infrastructure. Carefully transport the various equipment to the new facility.
Our team organized safe migration of computing and telecommunication equipment. Equipment was placed in two new server rooms with a total area of 120 sq. m.
Due to the detailed moving plan and considering possible risks, we completed everything on time and reduced operating costs.
Data centers
In three months, we managed to organize the complex process of migration of bank services between data centers. The move did not affect the continuity of business processes.
Computing infrastructure
Since the company changed its data center service provider, we promptly moved the equipment to another site. We also provided the company with insurance for the duration of the move.
Computing infrastructure
In just 12 hours, we moved the customer's data center. In a short time, we prepared a detailed plan for moving and installing computing equipment. This enabled quick and safe migration.